Smart company building project
Executed works: – (Waste Duct)
The administrative building project for Vodafone in the smart village
Executed works: – (stainless steel binding)
Cataract Hotel Project
Executed works:- (Equipping complete stainless steel kitchens)
Hilton Zamalek Hotel project
Executed works: – (Waste Duct System)
Safir Dokki Hotel project
Executed works: – (waste duct system, a complete line, a global system)
(Stainless steel shelving units for cold rooms)
(Supply and installation of refrigerators for the main restaurant)
Nile Investment Building Project in Smart Village
Executed works: – (waste duct system, a complete line, a global system),
(furniture duct system)
The commercial center in front of Terminal (3) at Cairo Airport
Executed works:- (waste tamping system, complete line, international system)
Sofitel Dahab Hotel
Executed works: – (supplying kitchen equipment), (cold rooms)
Veterinary stone, Alexandria port
Executed works:- (cold rooms)
Holiday Inn Citystars Nasr City
Executed works: – (Waste Duct System)
City Bridge City Stars Hotel, Nasr City
Executed works: – (Waste Duct System)
Air Force Hospital, Fifth Settlement
Executed works: – (Fully equipping hospital kitchens)
Building of the Ministry of Water Electricity, Nasr City
Executed works: – (Waste Duct System), (Waste Press Integrated System)
Jar Al Qamar Restaurant in Mohandessin
Executed works: – (fully equipping the restaurant’s kitchens)
The oil sites of the Dutch company, Nafta 1, 2, and 3
Executed works: (Full site kitchen equipment)
Petroleum site (Petrosan)
Executed works: (Providing some kitchen equipment,
Regular maintenance of kitchen and laundry equipment
Egyptian Food Company - Bisco Misr
Works implemented:- (Supply and equip some bakery equipment)
Nile Valley Club in Maadi
Executed works: – (Fully equipped club kitchens, stainless steel cladding)
Petroleum site (Petro Shahd)
Executed works: – (Fully equipped club kitchens, stainless steel cladding)
Petroleum website (Schlumberberg)
Executed works:- (Supply and equip some kitchen equipment)
(Perform regular maintenance of kitchen and laundry equipment)
Palm Hills Company (Fifth Settlement)
Executed works: – (a complete garbage duct system, a global system for 26 buildings)
Helou Al-Sham Company
Executed works: – (a complete garbage duct system, a global system for 26 buildings)
El Nakhil Maadi Hospital
Executed works (supplying and fully equipping kitchen equipment)
Villa Omar Suleiman in Mountain View, Fifth Settlement
Executed works: (supply and installation of waste duct system,
Complete furnishings (with a global system)
Engineer Ahmed Moussa’s villa in Arbella village, Fifth Settlement
Executed works: (Supply and installation of a complete waste duct system with a global system)
The National Authority for Military Production, Helwan Machinery and Equipment Company
Executed works:- (Manufacturing and installing a 5-ton refrigerated box for lorry trucks)
Al-Salam International Hospital in Maadi
Executed works:- (Manufacturing and installing a 5-ton refrigerated box for lorry trucks)
Al Safwa Hospital
Executed works:- (supply of stainless steel service trolleys)
Misr International Hospital
Works carried out: (manufacturing and supplying stainless steel refrigerators, cooling and freezing,
Supply and installation of a set of stainless steel shelves of different sizes,
Supply of stainless steel wheels
Modern Interiors Company
Executed works (manufacturing and installing 304 stainless steel floor drainage grates, 7 meters long, one piece, AutoCAD model design, laser cutting and assembly with a gradual incline in the direction of the drainage)
Engineering Company for Integrated Works (Al-Hikma Pharma Factory in October)
Executed works:- (Supply and installation of handrails, stainless steel 304)
316 stainless steel floor drain grates
316 stainless steel floor drain pipe, laser cutting and assembly
Inshaa Company for Contracting and Real Estate Investment (Egyptian Dar Al-Iftaa website)
Executed works: – (supply and installation of handrails (hand rails) stainless steel 304)
Air Specialized Hospital (New Cairo)
Executed works: (Manufacturing and supplying a 316 stainless steel sink equipped with an imported showerhead)
Alexandria Pharmaceutical Company
Executed works (manufacturing and supplying stainless steel 316 shovels of various sizes, stainless steel 316 tanks with internal laser grading)
Protection company
Executed works:- (ground drainage grills circular in shape with self-inclinations, diameter 25 meters, for the Juhayna milking company) (Al-Wahat)
United Engineering
Executed works: (Supply and installation of waste slides for (21) buildings for the Gate Compound project – Fifth Settlement)
United Concrete Plus Contracting
Executed works (supply and installation of a waste slide for (10) buildings for the Gate Compound Project – Fifth Settlement)
United Sons Anis Helmy Contracting
Executed works (supply and installation of a waste slider for (13) buildings for the Gate Compound Project – Fifth Settlement)
Arab company for development and urban development
Executed works (supply and installation of a waste slide for (19) buildings for the Galleria project in the Fifth Settlement)
Nile Valley Contracting Company
Executed works (supply and installation of a waste slide for (19) buildings for the Galleria project in the Fifth Settlement)
Mountain View Company - Fifth Settlement (I.CITY project)
Executed works (supply and installation of waste slides for (14) buildings)
Executed works (supply and installation of waste slides for (14) buildings)
Executed works: – (supply and installation of waste slides for (200) buildings)